Press
Pinhero Construction, Inc. Awarded Mutliple Projects For Golden West Food Group
OCT. 19 – Food manufacturer Golden West Food Group has awarded Pinhero Construction, Inc. the contracts for multiple projects at their Vernon location.
Pinhero will perform various scopes of work for the meat processing and distribution center. They offer a wide range of raw and cooked meats, including beef, sausage, pork, and poultry. GWFG also produces salsas, dips, hummus, soups, and sauces.
Pinhero will perform demo, racking, and (blank) for the 300,000 square foot facility south of downtown Los Angeles. The scope of work details a rack layout and forklift relocation for the processing factory.
Pinhero will also complete modifications for existing block wall openings for Impossible Foods, a plant-based burger manufactured inside Golden West Food Group.
Construction will take place over the course of five days, with the schedule set to begin on October 20th.
Pinhero will add to their current list of under-construction projects after a strong finish of 37,000 square foot space, Rodeo 39 Public Market which debuted their grand opening this past weekend.